  我公司生产的每台燃气bat365官方网站登录组出厂前必须经过严格的检验合格后方可出厂。我公司燃气bat365官方网站登录组的响应过程如下:
  Each gas generator set produced by our company must pass strict inspection before leaving the factory. The response process of gas generator unit of our company is as follows:
  首先,将燃气bat365官方网站登录组按具体生产要求进行封装,并准备在试验台上进行试验。
  Firstly, the gas generator set is packaged according to the specific production requirements, and is ready to be tested on the test bench.
  1.将试验燃气bat365官方网站登录组注满冷却液和足够的润滑油,连接载重线电缆,安装排烟管,连接启动电池;
  1. Fill the test gas generator unit with coolant and enough lubricating oil, connect the load line cable, install the smoke exhaust pipe and connect the starting battery;
燃气bat365官方网站登录组
  2.初步观察燃气bat365官方网站登录组的安装是否到位或安装错误,是否有漏油或漏水现象,并对bat365官方网站登录的耐压试验、匝间试验等各项指标进行试验。有不合格项及时修改处理的;
  2. Preliminarily observe whether the installation of gas generator unit is in place or wrong, whether there is oil leakage or water leakage, and test the voltage withstand test, turn to turn test and other indicators of the generator. Any unqualified item shall be modified and handled in time;
  3.机组启动成功后,空转2-3分钟,观察是否有异常情况,确认没有上升到高速1500rpm的异常情况。观察各种测试数据。频率为50HZ时,电压为400V,油压不低于硅bat365官方网站登录的油压。直到水温上升到60℃,开关已准备好进行负荷试验时,机组一切正常。
  3. After the unit is started successfully, idle for 2-3 minutes, observe whether there is any abnormal condition, and confirm that there is no abnormal condition rising to high speed 1500rpm. Observe various test data. When the frequency is 50Hz, the voltage is 400V, and the oil pressure is not lower than that of the silicon generator. Until the water temperature rises to 60 ℃, when the switch is ready for load test, the unit is normal.
  4.根据燃气bat365官方网站登录组的额定功率的大小分别随着负载测试,25%,50%,100%负荷阶段,如果每个荷载阶段在50 hz频率负载测试后,电压在380 v - 420 v电源的功率因数乘以当前理论的系数条件下的数据符合负载电流阅读作为一个合格的单位功率;观察发动机在运行过程中振动和烟雾颜色的变化;根据发动机的标准,判断没有故障;
  4. According to the rated power of the gas generator set, 25%, 50% and 100% load stages are respectively tested with the load. If the power factor of 380 V - 420 V power supply is multiplied by the current theoretical coefficient after the load test at 50 Hz frequency in each load stage, the data conforms to the load current reading as a qualified unit power; Observe the change of vibration and smoke color during the operation of the engine; judge whether there is any fault according to the standard of the engine;
  5.燃气bat365官方网站登录组试验工作完成后,记录试验负荷,记录试验时间和试验人员人数,并将机组备案和记录,对获准出厂的合格机组进行密封。
  5. After the completion of gas generator unit test, record the test load, test time and number of test personnel, record and record the unit, and seal the qualified unit approved to leave the factory.
  以上是燃气bat365官方网站登录组厂家小编为大家介绍的相关内容,想要了解更多内容,欢迎访问网站:
  The above is the relevant content introduced by the small edition of gas generator manufacturers. If you want to know more, please visit the website:
新闻搜索
bat365官方网站登录|Enter-on line
  • 服务热线

    0531-62325028
    0531-69951266

燃气bat365官方网站登录组出厂前试验过程大家了解吗

  我公司生产的每台燃气bat365官方网站登录组出厂前必须经过严格的检验合格后方可出厂。我公司燃气bat365官方网站登录组的响应过程如下:
  Each gas generator set produced by our company must pass strict inspection before leaving the factory. The response process of gas generator unit of our company is as follows:
  首先,将燃气bat365官方网站登录组按具体生产要求进行封装,并准备在试验台上进行试验。
  Firstly, the gas generator set is packaged according to the specific production requirements, and is ready to be tested on the test bench.
  1.将试验燃气bat365官方网站登录组注满冷却液和足够的润滑油,连接载重线电缆,安装排烟管,连接启动电池;
  1. Fill the test gas generator unit with coolant and enough lubricating oil, connect the load line cable, install the smoke exhaust pipe and connect the starting battery;
燃气bat365官方网站登录组
  2.初步观察燃气bat365官方网站登录组的安装是否到位或安装错误,是否有漏油或漏水现象,并对bat365官方网站登录的耐压试验、匝间试验等各项指标进行试验。有不合格项及时修改处理的;
  2. Preliminarily observe whether the installation of gas generator unit is in place or wrong, whether there is oil leakage or water leakage, and test the voltage withstand test, turn to turn test and other indicators of the generator. Any unqualified item shall be modified and handled in time;
  3.机组启动成功后,空转2-3分钟,观察是否有异常情况,确认没有上升到高速1500rpm的异常情况。观察各种测试数据。频率为50HZ时,电压为400V,油压不低于硅bat365官方网站登录的油压。直到水温上升到60℃,开关已准备好进行负荷试验时,机组一切正常。
  3. After the unit is started successfully, idle for 2-3 minutes, observe whether there is any abnormal condition, and confirm that there is no abnormal condition rising to high speed 1500rpm. Observe various test data. When the frequency is 50Hz, the voltage is 400V, and the oil pressure is not lower than that of the silicon generator. Until the water temperature rises to 60 ℃, when the switch is ready for load test, the unit is normal.
  4.根据燃气bat365官方网站登录组的额定功率的大小分别随着负载测试,25%,50%,100%负荷阶段,如果每个荷载阶段在50 hz频率负载测试后,电压在380 v - 420 v电源的功率因数乘以当前理论的系数条件下的数据符合负载电流阅读作为一个合格的单位功率;观察发动机在运行过程中振动和烟雾颜色的变化;根据发动机的标准,判断没有故障;
  4. According to the rated power of the gas generator set, 25%, 50% and 100% load stages are respectively tested with the load. If the power factor of 380 V - 420 V power supply is multiplied by the current theoretical coefficient after the load test at 50 Hz frequency in each load stage, the data conforms to the load current reading as a qualified unit power; Observe the change of vibration and smoke color during the operation of the engine; judge whether there is any fault according to the standard of the engine;
  5.燃气bat365官方网站登录组试验工作完成后,记录试验负荷,记录试验时间和试验人员人数,并将机组备案和记录,对获准出厂的合格机组进行密封。
  5. After the completion of gas generator unit test, record the test load, test time and number of test personnel, record and record the unit, and seal the qualified unit approved to leave the factory.
  以上是燃气bat365官方网站登录组厂家小编为大家介绍的相关内容,想要了解更多内容,欢迎访问网站:
  The above is the relevant content introduced by the small edition of gas generator manufacturers. If you want to know more, please visit the website: