一、燃气bat365官方网站登录组在运转时,不得做停缸检查,绝对不允许在机器运转时拿下高压线,这样会对人和机器造成信害。
1、 When the gas generator set is in operation, it is not allowed to perform cylinder shutdown inspection, and it is absolutely not allowed to remove the high voltage line while the machine is running, as this will cause harm to people and the machine.
二、要保持燃气bat365官方网站登录组高压包、高压线、高压帽等高压部分的清洁,以防对地高压放电,造成机器失火。
2、 To maintain the cleanliness of the high-voltage components of the gas generator set, such as the high-voltage package, high-voltage line, and high-voltage cap, in order to prevent high-voltage discharge to the ground and cause machine fires.
三、前后端盖上装有滚动轴承,采用复合钙基润滑脂润滑。如加人量过多容易造成润滑脂溢出,溅在滑环上将使接触不良,影响bat365官方网站登录的性能。
3、 Rolling bearings are installed on the front and rear end covers and lubricated with composite calcium based grease. If too much personnel are added, it is easy to cause lubricating grease to overflow and splash on the slip ring, which will cause poor contact and affect the performance of the generator.
燃气bat365官方网站登录组
四、燃气bat365官方网站登录组的绕组采用聚脂高强度漆包线绕制,允许温升105℃。因此,bat365官方网站登录绕组的绝对温度允许达到环境温度+105℃。所以检查bat365官方网站登录在正常运行时的温升是否正常,不能简单地靠人手触摸的感觉来判定。
4、 The winding of the gas generator set is wound with high-strength polyester enameled wire, allowing for a temperature rise of 105 ℃. Therefore, the absolute temperature of the generator winding is allowed to reach ambient temperature+105 ℃. So checking whether the temperature rise of the generator is normal during normal operation cannot be simply judged by the feeling of human touch.
五、燃气bat365官方网站登录组运行时,不允许用螺丝刀(起子)等金属物品将正极等接线柱与机壳或负极短接以观察有否火花来判断bat365官方网站登录是否发电,这样容易将元件烧坏。  根据工作条件的需要,要求全部员工进入燃气bat365官方网站登录组安装现场前,应戴上安全帽、穿戴好防护服、佩戴防护眼睛等保护工作。
5、 When the gas generator set is running, it is not allowed to use metal objects such as screwdrivers to short circuit the positive terminal and other wiring terminals to the casing or negative terminal to observe whether there is a spark to determine whether the generator is generating electricity, as this can easily burn out the components. According to the needs of working conditions, all employees are required to wear safety helmets, protective clothing, and protective eyes before entering the installation site of gas generator units.
新闻搜索
bat365官方网站登录|Enter-on line
  • 服务热线

    0531-62325028
    0531-69951266

燃气bat365官方网站登录组的安全操作事项介绍

一、燃气bat365官方网站登录组在运转时,不得做停缸检查,绝对不允许在机器运转时拿下高压线,这样会对人和机器造成信害。
1、 When the gas generator set is in operation, it is not allowed to perform cylinder shutdown inspection, and it is absolutely not allowed to remove the high voltage line while the machine is running, as this will cause harm to people and the machine.
二、要保持燃气bat365官方网站登录组高压包、高压线、高压帽等高压部分的清洁,以防对地高压放电,造成机器失火。
2、 To maintain the cleanliness of the high-voltage components of the gas generator set, such as the high-voltage package, high-voltage line, and high-voltage cap, in order to prevent high-voltage discharge to the ground and cause machine fires.
三、前后端盖上装有滚动轴承,采用复合钙基润滑脂润滑。如加人量过多容易造成润滑脂溢出,溅在滑环上将使接触不良,影响bat365官方网站登录的性能。
3、 Rolling bearings are installed on the front and rear end covers and lubricated with composite calcium based grease. If too much personnel are added, it is easy to cause lubricating grease to overflow and splash on the slip ring, which will cause poor contact and affect the performance of the generator.
燃气bat365官方网站登录组
四、燃气bat365官方网站登录组的绕组采用聚脂高强度漆包线绕制,允许温升105℃。因此,bat365官方网站登录绕组的绝对温度允许达到环境温度+105℃。所以检查bat365官方网站登录在正常运行时的温升是否正常,不能简单地靠人手触摸的感觉来判定。
4、 The winding of the gas generator set is wound with high-strength polyester enameled wire, allowing for a temperature rise of 105 ℃. Therefore, the absolute temperature of the generator winding is allowed to reach ambient temperature+105 ℃. So checking whether the temperature rise of the generator is normal during normal operation cannot be simply judged by the feeling of human touch.
五、燃气bat365官方网站登录组运行时,不允许用螺丝刀(起子)等金属物品将正极等接线柱与机壳或负极短接以观察有否火花来判断bat365官方网站登录是否发电,这样容易将元件烧坏。  根据工作条件的需要,要求全部员工进入燃气bat365官方网站登录组安装现场前,应戴上安全帽、穿戴好防护服、佩戴防护眼睛等保护工作。
5、 When the gas generator set is running, it is not allowed to use metal objects such as screwdrivers to short circuit the positive terminal and other wiring terminals to the casing or negative terminal to observe whether there is a spark to determine whether the generator is generating electricity, as this can easily burn out the components. According to the needs of working conditions, all employees are required to wear safety helmets, protective clothing, and protective eyes before entering the installation site of gas generator units.